Pressed the stones into the cement before it fully set so that the retaining key would seat into the cement. Used a small level and sledge to make sure all the blocks are level and on the same plain. Once the cement is fully set, we'll build this wall up to ~ 24" and then backfill to build a parking area for the truck/camper.